Laserfiche WebLink
• The Honorable Chairman and Planning Commission <br /> March 18, 1999 <br /> Page Two <br /> The drainage and utility comments contained in our letter dated February 19, 1999 are still valid. <br /> As of this date, we have not seen any revised drainage calculation. The one change that has <br /> been made is the water main is now shown to looped between phases 1 and 4. However, the <br /> other cul-de-sacs referenced in our previous letter are not shown to be looped at this time. <br /> If you have any questions regarding any of these comments, I will be in attendance at your <br /> March 23, 1999 Planning Commission meeting. <br /> Sincerely, <br /> HOWARD R. GREEN COMPANY <br /> Terry J.•M"aurer, P.E. <br /> TJ M:vtw <br /> S <br /> • <br /> I lowarc R. Green Comoa^y <br /> o./prof./804410J102401410-0318march09 CONSULTING ENGINEERS <br />