My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1997
>
07-22-1997
>
5.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 2:22:22 PM
Creation date
4/13/2018 2:22:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> Operator, which plans and materials are the basis for the City's <br /> • approval of the Conditional Use Permit. <br /> (03) The Operator shall orally notify the City of any violations of this <br /> permit within 24 hours and follow this with notification in <br /> writing within 4 working days of the violation. The operator <br /> shall notify the City annually in writing of the total area and <br /> amount of material mined and projected estimates of area and <br /> amount of material to be mined in the following year. This is to <br /> be done at time of license renewal. <br /> (04) The license must be renewed annually and shall run from <br /> January 1st through December 31st. The annual license fee is <br /> that which is specified by City Code at time of renewal. This <br /> license fee is not in lieu of gravel tax collected by the County <br /> and a portion of which the City receives. <br /> (05) Violations of this Conditional Use Permit may result in <br /> suspension or revocation. <br /> (06) The City Building and Zoning Administrator and/or his/her <br /> agents shall be permitted to inspect the operation for compliance <br /> • with the conditions of this permit during normal hours of <br /> operation. <br /> (07) The City's approval of this Conditional Use Permit is subject to <br /> the approval of appropriate permits by other governmental <br /> agencies. <br /> (08) No explosives shall be allowed for this operation. <br /> (09) Reclamation <br /> a. Reclamation shall be implemented on an annual basis <br /> pursuant to the reclamation plans submitted by the <br /> Operator. <br /> b. Each year a plan for that year's reclamation shall be <br /> approved by the Building and Zoning Administrator prior <br /> to issuance of the annual mineral excavation license. <br /> c. The reclamation shall include top soil from the site being <br /> preserved and put back into place after mining. <br /> • d. The vegetation established for the reclamation must be <br /> maintained until it is self sufficient. <br /> \\elkriver\sys\shrdoc\b&z\stever\gravcup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.