Laserfiche WebLink
295766 <br /> 7. THAT THE NATURAL VEGETATION BETWEEN THE PROPOSED ASPHALT PLANT <br /> • AND HIGHWAY 169 BE LEFT TO ACT AS SCREENING. FURTHER, THAT <br /> ADDITIONAL PINES ARE PLANTED TO FURTHER SCREEN THIS AREA. <br /> 8. THAT DURING DRY PERIODS THE SITE MUST BE WATERED TO AVOID DUST. <br /> 9. THAT BARTONS REIMBURSE THE CITY FOR THE COST OF REVIEWING THEIR <br /> PROPOSAL. THAT THE CITY HAS THE RIGHT TO CLOSE THIS OPERATION DOWN <br /> IF THERE IS IMMINENT DANGER AND THAT CITY STAFF HAS THE RIGHT TO <br /> INSPECT THE PREMISES AT ANY REASONABLE HOUR FOLLOWING <br /> NOTIFICATION. <br /> 10. THAT THE NORMAL HOURS OF OPERATION FOR THE PLANT ARE FROM 7:00 AM <br /> TO 7:00 PM, SEVEN DAYS A WEEK. HOWEVER, HOURS CAN BE EXTENDED FOR <br /> SPECIAL CASES BY THE BUILDING AND ZONING ADMINISTRATOR AS LONG <br /> AS THE ADDITIONAL HOURS DO NOT CREATE A NUISANCE FOR <br /> SURROUNDING RESIDENCES. FURTHER MPCA NOISE LEVELS MUST BE <br /> ADHERED TO AT ALL TIMES DURING THE OPERATION OF THIS PLANT. <br /> 11. THAT THE BAGHOUSE FILTER IS TESTED ONCE PER MONTH FOR LEAKS AND THE <br /> RESULTS OF THOSE TESTS ARE COPIED TO THE CITY. <br /> 12. THAT THIS CONDITIONAL USE PERMIT BE REVIEWED IN ONE YEAR AND A NEW <br /> PERMIT BE OBTAINED AT THAT TIME. <br /> 13. THAT STOCKPILES OF RECYCLABLE MATERIALS NOT BE PLACED IN SURFACE <br /> • WATER AND FURTHER THAT RUN-OFF FROM THESE STOCKPILES IS DIRECTED <br /> AWAY FROM ANY SURFACE WATER. THAT THE SIZE OF THE STOCKPILES BE <br /> LIMITED TO THE AMOUNT OF MATERIAL THAT COULD POSSIBLY BE USED IN <br /> ONE YEAR, BUT NOT NECESSARILY TO WHAT WILL BE USED IN ANY ONE GIVEN <br /> YEAR. FURTHER, THAT THE CITY UNDERSTANDS WITH THIS STIPULATION THAT <br /> SOME RECYCLABLE MATERIALS WILL BE RETAINED OVER THE WINTER SO THAT <br /> RECYCLING CAN START AT THE SAME TIME AS SPRING START UP FOR THE <br /> ASPHALT PLANT. <br /> 14. THAT COMMERCIAL ASPHALT CONTINUE TO WORK WITH CITY STAFF TO <br /> RESOLVE PROBLEMS WITH NOISE IF THEY ARISE. <br /> 15. AT STAFF'S DISCRETION, COMMERCIAL ASPHALT IMPLEMENT PART OR ALL OF <br /> THE ACTIONS IDENTIFIED BY STAFF TO ELIMINATE SEDIMENT FROM BEING <br /> INTRODUCED TO THE POND ON THE EAST SIDE OF HIGHWAY 169. <br /> 16. COMMERCIAL ASPHALT SHALL REDUCE ODOR FROM THEIR PLANT TO <br /> ACCEPTABLE LEVELS BY MODIFYING THEIR OPERATIONAL PROCEDURES OR <br /> PLANT EQUIPMENT. THE ELK RIVER PLANNING COMMISSION WILL REVIEW THE <br /> ODOR ISSUE AGAIN IN JUNE OF 1994. <br /> `rlf <br /> DATED this day of , 1994. <br /> • <br /> Page 2 of 3 <br />