Laserfiche WebLink
ITEM # 5.1. <br /> MEMORANDUM <br /> .y of <br /> Elk � TO: PLANNING COMMISSION <br /> River FROM: STEPHEN ROHLF, BUILDING <br /> G <br /> AND ZONING ADMINISTRATOR <br /> DATE: JUNE 16, 1997 SYS <br /> SUBJECT: RENEWAL OF CUP/ASPHALT <br /> PLANT BY COMMERCIAL <br /> ASPHALT CO. (CU 97-14) <br /> REQUEST: <br /> Commercial Asphalt Co. is requesting a one year extension to their current <br /> conditional use permit to continue operating a temporary asphalt plant in a <br /> gravel mine. <br /> BACKGROUND: <br /> • 1988: Original CUP issued for the temporary asphalt as an accessory to <br /> Barton's gravel mine. <br /> 1990: First renewal of CUP/ air emission testing completed/ MPCA issues 5 <br /> year permit/ mufflers added to reduce noise. <br /> 1992: Second renewal/ stack height and diameter increased and amount of <br /> recycled materials used is limited to help control odor. <br /> 1994: Third renewal <br /> ATTACHMENTS: <br /> Vicinity map - The subject property is located in the East Half of the <br /> Northwest Quarter of Section 22, Township 33, Range 26, Sherburne County, <br /> Minnesota. <br /> Cover letter - by Brent Schlueter of Commercial asphalt, dated May 27 , <br /> 1997. <br /> Site plan of operation. <br /> Current CUP. <br /> REVIEW: <br /> Commercial Asphalt, Co. is a division of Tiller Corporation (Barton Sand & <br /> • Gravel Company). They want their asphalt plant where their supply of sand <br /> \\elkrive r\sys\shrdoc\b&z\stever\comasph.doc <br /> 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • TDD & Phone: (612) 441-7420 • Fax: (612) 441-7425 <br />