My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1997
>
04-22-1997
>
5.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2018 4:27:06 PM
Creation date
4/13/2018 1:10:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 7, 1997 <br /> To: The Members of the Elk River City Council <br /> Dear Council Members; <br /> On March 6 we were informed of a moratorium on new construction in our area. We are <br /> currently in the process of planning and design of a new addition to our property that is located at <br /> 11061 173rd Avenue NW (behind Bridgeman's). This addition is planned as a permanent, free <br /> standing, steel frame, steel building which will match the appearance of the existing structure. <br /> The addition will add 5525 square feet of work space and will be positioned on the property in <br /> the same approximate area as the planned second building in the original Cody Square design of <br /> 1987. <br /> This building is being designed to allow immediate city sewer and water hookup when it <br /> becomes available. The existing fresh water well is adequate and will be used as a water source <br /> until that time. The plan also calls for two holding tanks for gray water and two tanks for waste <br /> water and sewage. These tanks will be pumped as needed. When City sewer service is available, <br /> the two waste water/sewage collection tanks will be cleaned and converted to gray water <br /> collection tanks. In addition, hookup for overhead fire suppression sprinklers will be installed to <br /> accommodate immediate fire truck hookup and future city water hookup. <br /> • This planned addition to the property is essential for the success of our respective businesses. <br /> Both businesses are active in the Elk River Chamber of Commerce and we support several <br /> community and youth activities. The inability for us to expand and build our new addition this <br /> Summer will severely limit the success of both businesses and the 12 families that are supported <br /> by employees of either Deano's or Precision Frame. <br /> As active members of the Elk River business community, we respectfully request an exception to <br /> the moratorium be granted for us to move ahead with our building plans for this Summer. <br /> Respectfully, \\ <br /> ichard A. orntson, President Thomas Wistrom, President <br /> Precision Frame & Alignment, Inc. Deano's Collision Specialists, Inc. <br /> /( <br /> & aL <br /> Nancy C.L9Tntson, ice President Cheryl istrom, Vice President <br /> Precision Frame &Alignment, Inc. Deano's Collision Specialists, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.