Laserfiche WebLink
• <br /> Page 4 <br /> (10) Traffic <br /> • a. Except for localized jobs, traffic through Elk River <br /> associated with this operation shall be limited to U.S. <br /> Highway 10 and 169. Haul trucks shall not be allowed to <br /> make right turns onto 225th Ave. when exiting the <br /> property. <br /> (11) Dust Control <br /> a. A permit from MPCA regarding air emissions shall be <br /> obtained when required and particulate emission <br /> standards shall be met by the operation. <br /> b. All equipment shall be located as to reduce dust to <br /> adjacent properties. <br /> c. Water, but no chemical agents, shall be used to control <br /> dust as necessary. <br /> d. The City reserves the right to require additional <br /> measures to be taken, if warranted by dust problems, <br /> . including but not limited to reducing stock pile heights, <br /> requiring routine sweeping of US Trunk Highway 169 at <br /> its intersection with 225th Ave. and temporarily closing <br /> the facility. <br /> (12) Hours of Operation <br /> All mineral excavation, processing, and sales activities shall be <br /> conducted between the normal hours of 7:00 a.m. and 7:00 p.m., <br /> Monday through Saturday with the following exception: <br /> Crushing may take place twenty-four hour a day for a maximum <br /> of 25 days per year, provided that this operation does not <br /> unreasonable annoy adjacent property owners. Problems <br /> arising from the extended hours (including, but not limited to, <br /> dust, traffic, glares, noise, etc.) shall first be directed to <br /> Bauerly's for resolution, then to city staff if need be, and finally <br /> to the Planning Commission and City Council of the City of Elk <br /> River (with public hearing) to determine if the extended hours <br /> shall be revoked. <br /> • <br /> s:\b&z\stever\gravcup2.doc <br />