Laserfiche WebLink
• <br /> The CUP and License both incorporate operating plans of the MPCA Permit. <br /> Our interpretation of this provision is that the CUP and license authorize the <br /> Landfill to be conducted according to plans approved by MPCA without the <br /> need for further approval by the City each time MPCA makes a modification <br /> to its permit. Nevertheless, the City has requested ERL obtain approval from <br /> the City for the development. The MPCA Permit, when it is reissued, will <br /> authorize construction of Cells 12 and 13 immediately. Cells 12 and 13 are <br /> part of the natural progression of the development of the Landfill as <br /> contemplated when the City's approvals were first granted in 1988. <br /> ERL has requested that MPCA review and approve a plan for increasing side <br /> slopes at the Landfill from 20 percent grades to 33 percent grades, in order <br /> to accommodate the original permitted capacity for the facility. By <br /> compromise with MPCA staff, waste deposit dimensions at the Landfill will <br /> not be increased, rather the difference between the original capacity and the <br /> capacity which can be currently developed will be banked for future <br /> • consideration. Accordingly, the Landfill height will not be increased beyond <br /> that which ERL contemplated in its original development plan. The maximum <br /> height at the Landfill will be 1 170 feet which is the maximum height that <br /> would be able to be effectively utilized at the 20% side slopes. City staff <br /> has raised concerns about the final elevation of the Landfill. We are prepared <br /> to address those concerns now or at such time as filling dictates the need to <br /> address final elevation issues. ERL is confident it can demonstrate there are <br /> no health, safety and welfare issues presented by developing the Landfill to <br /> its full capacity reaching the 1 170 elevation and that this elevation is <br /> consistent with original development plans. We are, however, prepared to <br /> discuss alternative development plans if the City so chooses. <br /> We enclose the following plans: <br /> • Long-Term Development Plan (18 sets) <br /> • Map of Site location (18 sets) <br /> • Map of Operations at the site (18 sets) <br /> • List of adjacent land owners (1 set) <br /> Please schedule this matter for appropriate City review at your earliest <br /> convenience. We understand the next Planning Commission meeting is April <br /> • 22, 1997 and the subsequent City Council meeting is May 19, 1997. In <br /> order to meet our construction schedule we respectfully request to be placed <br />