Laserfiche WebLink
EXISTING REQUIREMENTS <br /> ® 900 .18 - SCHEDULE OF DIMENSIONAL REGULATIONS <br /> 1. PRINCIPAL <br /> STRUCTURES <br /> Minimum Lot Building Setbacks Maximum Lot Maximum <br /> Requirements Front Side Garage Rear Coverage Heights <br /> Side <br /> A-1 10 Acres 50' 25' 25' 50' 20 percent 3 Floors <br /> [1] Non-Sewered 300' Width or 40' <br /> R-la <br /> Non-Sewered 2-1/2 Acres 35' 20' 20' 30' 25 percent 3 Floors <br /> 160' Width or 40' <br /> R-lb <br /> [2] Non-Sewered 1 Acre 35' 10' 10' 25' 25 percent 3 Floors <br /> 160' Width or 40' <br /> Note: Interior side yard setback from future lot line 10 feet <br /> Sewered 12,000 sq. ft. 35' 10' 5' 25' 25 percent 3 Floors <br /> 1110 80' Width or 40' <br /> R-lc <br />' [2] Sewered 10,000 sq. ft. 30' 10' 5' 20' 25 percent 3 Floors <br /> 80' Width or 40' <br /> [1] Non-Sewered 10 Acres 30' 10' 5' 20' 25 percent 3 Floors <br /> 300' width or 40' <br /> R-id <br /> Sewered 14,000 sq. ft. 35' 10' 5' 30' 25 percent 3 Floors <br /> 90' Width or 40' <br /> [1] Non-Sewered 10 Acres 35' 10' 5' 30' 25 percent 3 Floors <br /> 300' Width or 40' <br /> R-le <br /> Sewered 12,000 sq. ft. 30' 10' 5' 30' 25 percent 3 Floors <br /> 80' Width or 40' <br /> [1] Non-Sewered 10 Acres 30' 10' 5' 30' 25 percent 3 Floors <br /> 300' Width or 40' <br /> • . <br /> 9.59 <br />