Laserfiche WebLink
Trail Source Project List <br />Most Recent First <br />In 2017 Trail Source started working in Southeastern Iowa and built 4 miles of trails in Burlington Iowa <br />for the county and the local bike group. This trail system was built on extreme side slope with many <br />features that the local community had not experienced prior. Now this is one of the most popular trails in <br />the area. <br />Following Burlington we built trails in Asbury Iowa where Trail Source built the first ever mountain bike <br />trails for the city of Asbury. Following Asbury. Trail Source moved to Crosby Minnesota and worked on <br />separation of trail systems at the Cuyuna mountain biking area. Trail Source also built 5 miles at <br />Theodore Wirth Park for the Loppet Foundation as well as the Minneapolis Park and Recreation Board. <br />1 a. Most recently Trail Source has been building trail in Duluth MN. In 2016 we completed <br />approximately 10 miles of mountain bike specific trails in the Mission Creek area as well as about .5 mile <br />of trail in the Traverse Trail System. <br />1. Beck Lake, Cody Wyoming <br />This was a project built by Trail Source personnel in 2015. We built 8 miles of mountain bike optimized <br />trail on land owned by the City of Cody and The United States Bureau of Land Management (BLM). <br />This land is located in an area of the United States that is considered high plains dessert and has very <br />defined practices that are allowed by any contractor that works on this land. We were required to remain <br />in a very tight trail construction corridor in order to protect native plants and wildlife. Trail Source was <br />required to restore all non -trail areas to natural vegetation. <br />The trail included a Imile climb and a 2mile downhill flow trail optimized with berm turns, rollers, <br />directional rollers, drop ins and jumps. <br />All work was performed using a small rubber tracked mini -excavator, 2 rubber tracked Ditch Witch <br />dozers and hand tools. All machine operators have had a minimum of 4 years of experience running these <br />machines and are highly skilled and efficient in their work. The timeline for construction was <br />approximately 8 weeks of onsite construction. <br />Trail Source has been invited to return for a new project in 2017 to build an additional 4 miles of trail, a <br />pump park and a jump park in the same area. <br />2. S.W. Wirth Park Minneapolis MN. <br />This project was built by Trail Source in 2014. We built 4 miles of mountain bike optimized trail in this <br />park. This trail included approximately 1 mile total of gravity assisted flow trail. This mountain bike trail <br />was built to be one of the more difficult trails in the metro area. We built numerous drops, very large <br />berm turns, step up jumps, staircases and a couple of switchbacks. Included in the trail was a bump and <br />pump section. We worked on extreme side slope and because of the location of this park on the Western <br />edge of Minneapolis we had to be careful of all environmental concerns. <br />