Laserfiche WebLink
Page 4 <br /> (06) The City Building and Zoning Administrator and/or his/her <br /> • agents shall be permitted to inspect the operation for compliance <br /> with the conditions of this permit during normal hours of <br /> operation. <br /> (07) The City's approval of this Conditional Use Permit is subject to <br /> the approval of appropriate permits by other governmental <br /> agencies. <br /> (08) No explosives shall be allowed for this operation. <br /> (09) Reclamation <br /> a. Reclamation shall be implemented on an annual basis <br /> pursuant to the reclamation plans submitted by the <br /> operator. <br /> b. Each year a plan for that year's reclamation shall be <br /> approved by the Building and Zoning Administrator prior <br /> to issuance of the annual mineral excavation license. <br /> c. A $5,000 letter of credit, bond, or deposit, approved by <br /> III staff, shall be required prior to the issuance of the annual <br /> license to cover the forthcoming year's reclamation. <br /> d. The reclamation shall include top soil from the site being <br /> preserved and put back into place after mining. <br /> e. The vegetation established for the reclamation must be <br /> maintained until it is self sufficient. <br /> f. Contours, finished grades, details of erosion control <br /> methods, and settling ponds, shall comply with the plans <br /> submitted and the city ordinance at the time of <br /> reclamation. <br /> g. Fifty pines shall be planted on the berm between the <br /> subject property and US Trunk Highway 169 by 1996. <br /> The pines shall range in size from two to ten feet in <br /> height with a minimum of twenty pines being eight to ten <br /> feet in height. <br /> (10) Traffic <br /> • <br /> s:\b&z\stever\gravcup.doc <br />