My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1997
>
02-25-1997
>
6.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 11:58:19 AM
Creation date
4/13/2018 11:58:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to the Planning Commission/P 96-13 <br /> February 25, 1997 <br /> Page 5 <br /> 5. A surface water management fee as required by the City of Elk River <br /> • be paid prior to recording the final plat with Sherburne County. <br /> 6. Appropriate approvals be obtained for filling any wetlands on site. <br /> These approvals must be obtained prior to final plat approval. <br /> 7. A tree preservation plan be submitted along with a grading plan <br /> identifying those areas which will be saved during the grading of the <br /> site. The plan shall specify the actions that will be taken to <br /> adequately protect these wooded areas during the grading. <br /> 8. An NPDES permit be obtained from the MPCA prior to beginning <br /> grading on site. <br /> 9. A grading plan be submitted, reviewed and approved by the City <br /> Engineer prior to beginning any grading on site. This grading plan <br /> shall identify the erosion control measures that will be used during the <br /> grading process. <br /> 10. Appropriate permits be obtained from Sherburne County Highway <br /> Department for any work done within the County right of way. <br /> 11. Prior to issuance of any building permits, a development plan will need <br /> to be submitted outlining the style of homes and finished floor <br /> elevations. This plan will need to be approved by the City Engineer <br /> prior to issuance of any building permits. <br /> 12. The developer reimburse the city for costs associated with reviewing <br /> this plat prior to releasing the plat for recording with Sherburne <br /> County. <br /> 13. The developer will need to provide a letter of credit to the City of Elk <br /> River in the amount of 100% of the costs associated with improvements <br /> within the development. <br /> 14. Street lights will need to be provided throughout the development in <br /> locations as recommended by Elk River Municipal Utilities. This <br /> improvement shall be included along with other infrastructure (i.e., <br /> street, utilities) <br /> 15. Clustered mailboxes be utilized throughout the development. <br /> 16. A complete landscape plan be submitted for approval prior to recording <br /> • the plat with Sherburne County. This plan shall include yard trees as <br /> required per ordinance, a landscaped area along Proctor, the required <br />
The URL can be used to link to this page
Your browser does not support the video tag.