My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.6
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1996
>
10-22-1996
>
3.6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 10:13:38 AM
Creation date
4/13/2018 10:13:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i 1NEEILS <br /> CONSULTING ENG <br /> 1326 Energy Park Drive <br /> St.Paul,MN 55108 October 16, 1996 <br /> File: 230-000-00 <br /> 612-644-4389 <br /> 1-800-888-2923 <br /> Fax:612-644-9446 Mr. Steve Rohlf <br /> Building and Zoning Administrator <br /> City of Elk River <br /> 13065 Orono Parkway <br /> P.O. Box 490 <br /> Elk River, MN 55330 <br /> RE: SHIELY COMPANY'S CONDITIONAL USE PERMIT <br /> Dear Mr. Rohlf: <br /> CIVIL ENGINEERING: <br /> ENVIRONMENTAL As requested, I have reviewed the traffic flow situation on 213th Avenue (County Road <br /> MUNICIPAL 77) as it pertains to the Shiely Company's request for a Conditional Use Permit to install <br /> WNNING a concrete batch plant. It is my understanding that this operation is expected to generate <br /> O WASTE 100 trucks per day or, in other words, approximately 200 trips along County Road 77. <br /> STRUCTURAL From my review of the situation, the access point is located sufficiently west of the <br /> SURVEYING intersection with TH 169. The site distances at the access point appear to be adequate for <br /> TRAFFIC the trips expected. The intersection of County Road 77 with TH 169 has the appropriate <br /> TRANSPORTATION geometrics included in the design to handle this number of truck trips on a daily basis. <br /> Therefore, from a traffic consideration, I see no problem with this proposal. <br /> ELECTRICAL/MECHANICAL <br /> ENGINEERING: If you need any additional information or have questions, please call. <br /> HVAC <br /> POWER DISTRIBUTION Sincerely, <br /> SCADA <br /> SYSTEM CONTROLS MSA, CONSULTING ENGINEERS <br /> Terry J. aurer, P.E. <br /> TJM:tw <br /> 000-1602.oct <br /> OFFICES IN: <br /> NNEAPOLIS <br /> IOR LAKE <br /> ST.PAUL <br /> WASECA <br /> An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.