My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 04-16-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
04-16-2018
>
4.5. SR 04-16-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 9:58:12 AM
Creation date
4/13/2018 9:57:15 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/16/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />10 <br />to do so will not affect the Developer’s and City’s rights or obligations hereunder. If the Developer <br />does not reimburse the City for any cost the City incurred for such work within ten (10) days, the <br />City may draw down the letter of credit to pay any costs. No development, utility or street <br />construction will be allowed and no building permits will be issued unless the plat is in full <br />compliance with the approved erosion control plan. <br />(04) Grading. The Subdivision shall be graded in accordance with the approved grading <br />development and erosion control plan, Plan B. The plan shall conform to City specifications. <br />Within thirty (30) days after completion of the grading and before the City approves individual <br />building permits (except up to three model home permits on lots acceptable to the Building Official <br />per section 18), the Developer shall provide the City with an “as constructed” grading plan certified <br />by a registered land surveyor or engineer that all storm water treatment/infiltration basins and swales, <br />have been constructed on public easements or land owned by the City. The “as constructed” plan <br />shall include field verified elevations of the following: (a) cross sections of storm water <br />treatment/infiltration basins; (b) location and elevations along all swales, wetlands, wetland <br />mitigation areas if any, locations and dimensions of borrow areas/stockpiles, and installed <br />“conservation area” posts; and (c) lot corner elevations and house pads, and all other items listed in <br />the City Code. The City will withhold issuance of building permits until the approved certified <br />grading plan is on file with the City and all erosion control measures, including full vegetation of <br />entire site, are in place as determined by the City Engineer. The Developer certifies to the City that <br />all lots with house footings placed on fill have been monitored and constructed to meet or exceed <br />FHA/HUD 79G specifications. The soils observation and testing report, including referenced <br />development phases and lot descriptions, shall be submitted to the Building Official for review prior <br />to the issuance of building permits. <br />(05) Clean Up. The Developer shall clean dirt and debris from all streets that has resulted from <br />construction work by the Developer, home builders, subcontractors, their agents or assigns, until all <br />requirements of this agreement have been satisfied. Prior to any construction in the plat, the <br />Developer shall identify in writing a responsible party and schedule for erosion control, street <br />cleaning, and street sweeping. <br />(06) National Pollutant Discharge Elimination System Requirements. Prior to the <br />commencement of any work, the Developer shall provide a signed Storm Water Pollution Prevention <br />Plan for City review and approval to control erosion from the site. Because the site is over one (1) <br />acre, the Developer shall also apply for and obtain an NPDES permit from the Minnesota Pollution <br />Control Agency. <br />(07) Municipal Separate Storm Sewer System Requirements. All stormwater management <br />activities shall comply with the City MS4 permit. <br />15. Default. <br />(01) Remedies. In the event of default by the Developer as to any of the work to be performed <br />by it hereunder, the City may, at its option, perform the work and the Developer shall promptly <br />reimburse the City for any expense incurred by the City, provided the Developer, except in an <br />emergency as determined by the City, is first given notice of the work in default, not less than forty- <br />eight (48) hours in advance. This Agreement is a license for the City to act, and it shall not be <br />necessary for the City to seek a Court order for permission to enter the land. When the City does <br />any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. <br />(02) Acceleration on Default. In the event Developer, or its heirs, successors or assigns, violates <br />any of the covenants and agreements herein contained, or fails to pay any amount due to the city, the
The URL can be used to link to this page
Your browser does not support the video tag.