My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 04-16-2018
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2018
>
04-16-2018
>
4.5. SR 04-16-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 9:58:12 AM
Creation date
4/13/2018 9:57:15 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/16/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />8 <br />10. General Provisions Binding Effect. The terms and provisions hereof shall be binding <br />upon, and inure to the benefit of the heirs, representatives, successors and assigns of the parties hereto and <br />shall be binding upon all future owners of all or part of the Subdivision and shall be deemed covenants <br />running with the land. References herein to Developer, if there be more than one, shall mean each and all of <br />them. This Agreement shall be placed of record so as to give notice hereof to subsequent purchasers and <br />encumbrances of all or any part of the Subdivision, and all recording fees, if any, shall be paid by the <br />Developer. <br />(01) Severable. In the event that any portion of this Agreement shall be held invalid for any <br />reason, the same shall not affect in any respect whatsoever the validity of the remainder of this <br />Agreement. <br />(02) Waiver. Any waiver, whether express or implied, by any party of a breach of any provision <br />of this Agreement will not operate as or be construed to be a waiver of any subsequent breach of this <br />Agreement. <br />(03) Construction Times. All construction activities authorized by this agreement shall be <br />confined to the following hours of operation: <br />Monday - Friday 7:00 AM until 9:00 PM <br />Saturday 8:00 AM until 5:00 PM (only with 48 hour advance notice to the <br />City Engineer or their representatives) <br />Sunday Not Allowed <br />This does not apply to activities that are required on a 24-hour basis such as dewatering, etc. Any <br />deviation from the above hours is subject to approval of the City Council. <br />(04) Street Construction. No street construction will be allowed after October 15 or prior to <br />May 15 unless approved by the City Engineer. <br />(05) Snowplowing. Until the Improvements are accepted by the City or an agreement expressly <br />reached in advance, the developer is responsible for snow removal and ensuring access by <br />Emergency Response equipment. <br />(06) Mailboxes. All mailboxes be clustered, and in a style and location acceptable to the City of <br />Elk River. <br />(07) History. Any item or condition found that indicates the site is likely to yield information <br />important to pre-history or history shall be reported to the city immediately, and the city reserves the <br />right in such event, to stop work immediately until the subdivision is appropriately investigated and <br />developer is authorized to recommence work. <br />11. Park Dedication. Developer shall satisfy park dedication requirements through a cash <br />donation equal to the low-density Park Dedication fee identified in the city’s fee schedule at the time of Final <br />Plat recording. The current amount is One Hundred Two Thousand, Six Hundred Sixty Six and 96/100 <br />dollars ($102,666.96), ($1,425.93 per lot). <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.