Laserfiche WebLink
ATM' <br /> Cellular Division AT&T Wireless Services <br /> September 12, 1996 2515 24th Avenue South <br /> p Minneapolis, MN 55406 <br /> 612 721-1660 <br /> FAX 612 721-4770 <br /> Mr. Scott Harlicker <br /> Planning Department <br /> City of Elk River <br /> 13065 Orono Parkway <br /> P.O. Box 490 <br /> Elk River, MN 55330 <br /> Re: Additional information for Antenna Tower Overlay Zone <br /> Dear Scott: <br /> As per our telephone conversation and the Fax that you sent to me, I am sending <br /> you some additional information that you requested. As pertaining to: <br /> 1. Elevations: I am enclosing an elevation drawing prepared by Ulteig Engineers, <br /> Inc., depicting the pole, antenna placement and the equipment shelter. The height of the <br /> • pole is 197 feet with the tip of the antenna placed at 199 feet. The equipment shelter <br /> measures 12'x24' in size. <br /> 2. Proof of need: I am enclosing colored copies of frequency coverage. One of <br /> the diagrams shows the existing conditions and coverage and the other diagram shows the <br /> improved conditions and coverage. The red area show the acceptable coverage and the <br /> green shows the unacceptable coverage. <br /> 3. Proof of non-interference: I am enclosing a diagram showing the different <br /> frequencies that are used by cellular, radio and television stations. Because of the <br /> difference in frequencies, there is no interference caused by the cellular(wireless) <br /> equipment. <br /> 4. Revised site plan: The revised site plan shows the access to the site, plus some <br /> of the trees and vegetation that must be removed for the construction of the site. If <br /> required AT&T Wireless Services will replace some of the vegetation with new <br /> landscaping. <br /> 5. F.A.A. or Minnesota Department of Transportation regulation: Any tower <br /> that exceeds 200 feet in height, an application must be submitted to the F.A.A. for their <br /> review. Because of the proposed height of the pole and antenna's, AT&T is not required <br /> to file for F.A.A authorization, but AT&T usually files for all locations and has <br /> • <br /> Y_1< Recycled Paper <br />