My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5, 6.6
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1996
>
09-24-1996
>
6.5, 6.6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 9:52:39 AM
Creation date
4/13/2018 9:52:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> __ ATT <br /> • <br /> Cellular Division AT&T Wireless Services <br /> 2515 24th Avenue South <br /> Minneapolis, MN 55406 <br /> 612 721-1660 <br /> FAX 612 721-4770 <br /> August 27, 1996 <br /> Honorable Mayor and City Council Members <br /> Planning Commission <br /> City of Elk River <br /> 13065 Orono Parkway <br /> P.O. Box 490 <br /> Elk River,MN 55330 <br /> RE: Conditional Use Permit Application <br /> Wireless Communication Antenna Site <br /> • Honorable Mayor, Council Members, and Commissioners: <br /> This letter accompanies an application for a Conditional Use Permit to construct a Wireless <br /> Communication antenna site on land owned by Mr. Les Lundquist and Mr. Floyd Kruse. The property <br /> as is sits today is currently undeveloped. <br /> The request is being made in the name of AT&T Wireless Services. The fee owners have consented to <br /> this application and have entered into a lease agreement with the applicant for a portion of their <br /> property. Drawings and site surveys of the property accompany this letter. <br /> The Proposed Use. <br /> The site would be used by AT&T Wireless Services, one of the two companies who were <br /> originally licensed by the Federal Communications Commission (FCC) to provide essential cellular <br /> communications services to the Twin Cities. The proposed project would include a steel monopole with <br /> antennas attached to it and the construction of an equipment building to accommodate cellular radio and <br /> switching equipment. <br /> The proposed location is on the approximate northeasterly portion of the property . This <br /> specific site was chosen based on the following criteria: <br /> • AT&T Wireless Services' engineering and system development needs <br /> . • The need for improved cellular coverage as dictated by our customers <br /> \bocfr Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.