Laserfiche WebLink
Mr. Steve Ach <br /> • <br /> August 19, 1996 <br /> Page Two <br /> 5. It is unclear as to how stormwater runoff is anticipated to leave the stormwater <br /> retention pond. They show a rip-rap overflow in the corner; however, the grading <br /> for the pond would indicate that, once the pond overtops, it will overtop in several <br /> directions at 995. Also, Lions Park Drive surrounds the pond. This indicates that <br /> the overtopping of the pond will also overtop Lions Park Drive. More detail <br /> needs to be provided on how it is anticipated the pond will work. <br /> 6. The light fixtures for the new parking lot are shown in the parking area. It may <br /> be a better idea to place as many light fixtures as possible in the concrete islands <br /> to avoid damage from cars or maintenance vehicles. <br /> If you have any questions regarding any of these comments, please call. <br /> Sincerely, <br /> MSA, CONSULTING ENGINEERS <br /> • <br /> Terry J. Maurer, P.E. <br /> TJM:db <br /> 339-1411 aug <br /> 411 <br />