My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1996
>
06-25-1996
>
5.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2018 8:58:29 AM
Creation date
4/9/2018 4:03:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• "ill St <br /> CONSULTING ENGINEERS June 19, 1996 <br /> 1326 Energy Park Drive File: 230-323-11 <br /> St.Paul,MN 55108 <br /> 612-644-4389 Mr. Steve Ach <br /> 1-800-888-2923 City Planner <br /> Fax:612-644-9446 City of Elk River <br /> 13065 Orono Parkway <br /> P.O. Box 490 <br /> Elk River, MN 55330 <br /> RE: GRACE ASSEMBLY OF GOD CHURCH <br /> SITE PLAN REVIEW <br /> Dear Mr. Ach: <br /> CIVIL ENGINEERING: As requested, we have reviewed the submittal for the Grace Assembly of God Church. <br /> ENVIRONMThe packet we reviewed was prepared by Robert Baker, Architect, and dated May 28, <br /> "'MUNICIPAL 1996. Based on our review and comments received at the staff review meeting, we would <br /> PLANNING offer the following comments: <br /> SOLID WASTE <br /> STRUCTURAL 1. On the interior of the parking lots, the double row of parking, the City ordinance <br /> SURVEYING requires a depth of 20 feet on each stall for a total width of 40 feet. These double <br /> TRAFFIC rows of parking are currently shown as 36 feet wide. <br /> TRANSPORTATION <br /> 2. At the south end of the parking area, a drive isle should be provided around the <br /> ELECTRICAL/MECHANICAL parking rows. <br /> ENGINEERING: <br /> HVAC 3. The grading plan shows all drainage being funneled to the southwest corner of the <br /> POWER DISTRIBUTION <br /> parking lot where it is discharged through an opening in the curb that is rip-rapped. <br /> SCADA <br /> We would suggest that it would be better to install catch basins and small diameter <br /> SYSTEM CONTROLS <br /> storm sewer to convey a run-off to the proposed storm sewer pond. <br /> 4. Grading along the east and south property lines indicate that the CSAH 13 drainage <br /> will be conveyed through a culvert under the driveway and along a proposed swale <br /> south of the parking area to the proposed pond on-site. We question whether or <br /> not the pond is adequately sized to take all the drainage along the CSAH 13 ditch. <br /> At some point in the future, we will need to see drainage calculations that show the <br /> tributary area north of the culvert, provide documentation that a 15-inch culvert is <br /> satisfactory, and provide inverts for that culvert. <br /> •OFFICES IN: <br /> MINNEAPOLIS <br /> PRIOR LAKE <br /> ST.PAUL <br /> WASECA <br /> An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.