Laserfiche WebLink
MAY-24-1996 1 04 P.04/05 <br /> 1 <br /> NSIiIT1NGENGINEER May 24, 1996 <br /> File: 230-317-11 <br /> 1326 Energy Park Drive <br /> St.Paul,MN 55108 <br /> 612.644-4389 Mr. Steve Ach <br /> 1-800.888.2923 City Planner <br /> Fax 612-644-9446 City of Elk River <br /> 13065 Orono Parkway <br /> P.O. Box 490 <br /> Elk River, MN 55330 <br /> RE: RENNER ADDITION <br /> Dear Mr. Ach: <br /> As requested, we have reviewed the submittal for the Renner Addition. The submittal was <br /> CIVILENGINEERINC prepared by John Oliver and Associates and contained a preliminary plat and a preliminary <br /> ENVIRONMENTAL grading plan, both of which were dated April 30, 1996. Based on our review, comments <br /> MUNICIPAL received at the staff review meeting, and comments from a meeting with the Developer <br /> PLANNING and John Oliver and Associates, we would offer the following comments: <br /> ID WASTE <br /> RUCTURAL 1. The plat creates one large lot, approximately six acres in size, adjacent to TH 10_ <br /> SURvEYING It also provides right-of-way for the start of a frontage road off of Jarvis and the <br /> TRAFFIC remnant, approximately one-half acre in size, is platted as an outlot north of the <br /> TRANsvoRTAnoN road right-of-way. It is our understanding that the outlot will be added to the <br /> Renner & Sons Well Drilling property immediately to the north. <br /> ELECTRICAL/MECHANICAL <br /> ENGINttRING. 2. The plat adds 17 feet to the existing right-of-way of Jarvis Street. By acquiring an <br /> HVAC additional 17 feet on the opposite side of the street, the City will have a 100-foot <br /> POWER DISTRIBUTION right-of-way. When this area develops, the intersection of Jarvis and TH 10 will <br /> SCADA <br /> SYSTEM CONTROLS likely be signalized and the additional right-of-way will be needed to provide for <br /> intersection and roadway geometric improvements. <br /> 3. The preliminary grading plan shows storm drainage for Lot 1, Block 1, being a <br /> retention pond located just off of the northwest corner of the property. We would <br /> recommend that the ponding which is required for Lot 1, Block 1, be incorporated <br /> into the actual lot, and be provided with a drainage easement over this area. At <br /> some point in the future, specific drainage calculations will need to be supplied for <br /> the facility expected to be constructed on Lot 1, Block 1, to ensure that the pond <br /> OFFICES IN: is adequately sized. <br /> MINNEAPOLIS <br /> •CR LAKE <br /> ST.PAUL <br /> WASECA <br /> An Equal Opportunity Employcr <br />