Laserfiche WebLink
Memo to the Planning Commission/CU 96-6 Page 2 <br /> April 23, 1996 <br /> ID included. To facilitate access to the new parking lot, a 90 foot easement will <br /> be acquired along the north property line of the church to Gates Avenue. <br /> In order to complete construction of the new facility and parking area, an <br /> existing house on site will need to be removed. However, the existing school, <br /> rectory, youth center and church which will now be used as an auditorium, <br /> will remain on site. In total, the St. Andrews' campus will have <br /> approximately 54,000 square feet of building space when the new church is <br /> completed. <br /> Surrounding Land Use <br /> The church is bordered on the west and south by residential streets. <br /> Immediately to the east is a large vacant piece of property with one existing <br /> single family home. North of the church property are parcels that will be <br /> directly impacted with the new parking lot expansion. A one-level apartment <br /> complex and four single family homes currently exist. As will be discussed <br /> later, proper buffering along the north edge of the property will be <br /> recommended as part of this improvement. <br /> Parking <br /> • The zoning ordinance requires one parking space per three seats of the main <br /> seating area. Based on the 1,000 seats proposed at this time, 333 parking <br /> spaces would be required. St. Andrews is proposing to provide as much on <br /> site parking as possible and continue to utilize the on street parking <br /> opportunities that exist on Irving and 4th Street. The church has also <br /> identified 59 parking spaces at the Mork Clinic; however, the convenience of <br /> these parking stalls is questionable since they are over 500 feet away from <br /> the new church facility. <br /> Typically, all land uses are responsible for providing their required parking <br /> on site. Right now, St. Andrews probably provides about 75 percent of their <br /> parking as on street parking. The new expansion and added parking lot will <br /> not accommodate all of their required parking on site; however, will improve <br /> their current situation. Furthermore, given the operational characteristics of <br /> a church, it is not uncommon that a certain percentage of on street parking <br /> occur. Irving Street and 4th Avenue are both wider than a typical residential <br /> street, therefore, can accommodate on street parking and still allow normal <br /> traffic movements to occur. <br /> • <br /> s:\planning\pc\cu96-6.doc <br />