Laserfiche WebLink
• Co. RD. 13 from Main Street to Tyler Street: <br /> • Deficiency Location: From Main Street and 169 up CR 13 to Tyler <br /> Street. <br /> • Traffic Projections: <br /> Main Street East of 169: <br /> Ultimate volumes with no road improvements: 26,500 <br /> Ultimate volumes with road additions: 33,400 <br /> Net traffic increase of 26%11m1 <br /> ID <br /> CR13 North from Main Street <br /> Ultimate volumes with no road improvements: 17,700 <br /> Ultimate volumes with road additions: 9,000 <br /> Net traffic reduction of 97% <br /> Pg.5 <br /> III <br />