Laserfiche WebLink
Processing Facility shall be provided substantially in accordance with the plans • <br /> submitted by Northern States Power Company with the original application for <br /> a conditional use permit and the November 28, 1989 application for renewal of <br /> conditional use permit, which are hereby made a part of this Permit. In <br /> addition, these plans shall be further revised to provide a hard surfaced, diked <br /> area to drop hot loads of processed RDF so that they can be put out and fire <br /> suppression water retained; and to further provide that all areas on the facility <br /> site are either hard surfaced parking and drive areas, pea rock or asphalt <br /> shavings for equipment storage, or landscaped areas with grass. There shall <br /> be no gravel or dirt areas on the facility site. The revised plans shall be <br /> submitted by December 31, 1990, and all improvements installed by <br /> September 30, 1991. <br /> 3. All utility and street construction plans and specifications as presented by <br /> Northern States Power Company for the Facility and servicing streets must be <br /> prepared by a Registered Civil Engineer in accordance with directions of and <br /> approved by the City Engineer. <br /> 4. All building plans and specifications must be approved by the City Building <br /> Inspector and Fire Chief. <br /> 5. Approval of driveway entrances, if needed, on State and County highways <br /> shall be secured from the appropriate agencies and filed with the City Zoning <br /> Administrator prior to issuance of any building permit. Street lighting and 111 <br /> acceleration and deceleration lanes for Highway 10 at the intersection of 165th <br /> Street and Highway 10 shall be installed by City to provide safe access to <br /> Highway 10 for trucks entering and leaving the Facility. Failure by Permittee <br /> to reimburse the City for the installation of said improvements within thirty <br /> (30) days of receiving an invoice for all or any part of said improvements shall <br /> be cause for revocation of this Permit. <br /> 6. The City shall have the right of access to all areas of the Processing Facility <br /> and site for the purpose of inspection to ensure compliance with all of the <br /> terms and conditions of this permit and the Solid Waste Facility License for <br /> the Facility. The City need not give prior notice to the Permittee for <br /> personnel to access the Processing Facility or site during the normal waste <br /> receiving hours of 6 a.m. to 6 p.m., Monday through Saturday, or if an <br /> explosion or other emergency occurs. At any other time, at least twelve (12) <br /> hours prior notice to the Permittee is required. Such access shall be in <br /> accordance with reasonable safety standards and reasonable proprietary <br /> information requirements. <br /> Alternatively, the City may, in its discretion, upon thirty (30) days notice to <br /> Permittee, to further ensure compliance with the restrictions in this Conditional <br /> PXB 103258 2. • <br />