Laserfiche WebLink
Page 4 <br /> • screening plan will include preserving heavily wooded areas, where <br /> they exist, and installing berms with evergreens in non-wooded areas. <br /> 7. Insurance <br /> Item 10 of the conditional use permit and Item 11 of the license titled, <br /> "Insurance", have been updated to reflect the maximum limits <br /> available. <br /> 8. Fees <br /> The landfill was paying only 70% of the cost incurred by the city for <br /> renewing their conditional use permit and license. Their new permits <br /> reflect them paying 100% of these costs. Also, the day-to-day costs to <br /> the city for administering these permits will be billed to the landfill <br /> and they will pay 100%. <br /> 9. Renewal Date <br /> With the additions to the Elk River Landfill's conditional use permit <br /> and license previously listed, staff feels adequate conditions exist to <br /> • ensure public safety and welfare. Therefore, we are recommending <br /> that the landfill license and conditional use permit be placed on a 4 <br /> year renewal period verses a 2 year. <br /> Recommendation <br /> Representatives of the Elk River Landfill and city staff have met several <br /> times regarding the renewal of their permits. The landfill is in agreement <br /> with the proposed changes. With the additional stipulations placed in these <br /> permits, staff feels that the seven standards for approving a conditional use <br /> permit and the standards found in the Solid Waste Ordinance of the City <br /> Code of Ordinances, are met. We are recommending approval of both the <br /> attached conditional use permit and solid waste facility license for the Elk <br /> River Landfill. <br /> • <br /> pc-12-12s/stever <br />