My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.6
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
12-19-1995
>
6.6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 3:38:55 PM
Creation date
4/6/2018 3:38:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• report on the amount and type of demolition debris disposed of each <br /> day during the month. The Surcharge due for each month shall be <br /> received by the City no later than the thirtieth calendar day of the <br /> succeeding month. Failure to pay the surcharge fee when due shall be <br /> cause for revocation of this License and shall be a violation of the <br /> conditions and requirements of this License for the purposes of the <br /> related operations authorized by Section 3 of this License. <br /> (e) That Licensee is in strict compliance with all other terms, conditions <br /> and requirements of this License, including specifically, but not limited <br /> to, the operational requirements, performance standards and <br /> environmental monitoring requirements of sections 4, 6, 7, and 8; and <br /> the requirements of sections 17 and 25 to make prompt payment of all <br /> fees due to the City. No demolition debris may be accepted at the <br /> demolition debris landfill if this condition is not complied with. <br /> Licensee must immediately stop accepting demolition debris upon <br /> written notice from the City that there is a violation of this condition. <br /> (04) Other Related Operations. No other operations or activities, whether or not <br /> related to the Landfill, shall be permitted or allowed on the Landfill Property unless <br /> this License is first amended to specifically allow such operations and to specify the <br /> applicable conditions except mining activities or other operations licensed or permitted <br /> • separately by the City. <br /> 4.) Specific Additional Operational Requirements. <br /> (01) Leachate Transmission Pipes. The leachate transmission pipe shall be <br /> redesigned for subsequent Landfill phases to include the use of secondary containment <br /> capability. Licensee shall verify to the City every four (4) years that the existing pipe <br /> does not leak. <br /> (02) Backup Leachate Pumps. Licensee shall maintain backup pumps for use in the <br /> event of pump failure at the wet well and leachate storage tank on-site, or shall <br /> maintain provisions for restoring temporary leachate pumping within a 24-hour <br /> period. <br /> (03) Leachate Holding Tank. Licensee shall ensure that the leachate holding tank is <br /> pumped out on a regular schedule. It shall be a violation of this License to allow <br /> leachate to collect on the liner to a depth exceeding one foot due to the leachate <br /> holding tank being full. <br /> (04) Gas Venting System. Initiate operation of the active landfill gas venting <br /> system by March 1, 1996. <br /> 4111 <br /> PXB 100940 <br /> 6. <br />
The URL can be used to link to this page
Your browser does not support the video tag.