My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.6
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
12-19-1995
>
6.6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 3:38:55 PM
Creation date
4/6/2018 3:38:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(11) Industrial Solid Waste Management Plan, Version D, August 1991 and further <br /> conditioned upon submittal of annual reports describing the following: <br /> (a) Monthly and Annual Waste Disposal Volume. <br /> (b) Schedule of construction activities for the forthcoming year. <br /> (c) Type, Quantity and Source of Material to be Disposed. <br /> (d) Remaining permitted capacity. <br /> (e) Updated contour map which indicates the elevations of all fill areas. <br /> (f) Assessment of the Financial Assurances Plan. <br /> (g) Evaluation of the Water Monitoring System and a proposal for <br /> continued sampling and analysis. <br /> (h) Detailed evaluation of all water quality results by means of tables and <br /> graphs. <br /> (i) A groundwater contour map based on the previous years' groundwater <br /> level data. <br /> The above described reports and any proposed changes in the plans and reports shall <br /> be reviewed and approved, approved with modification, or disapproved by the City. <br /> The City may not unreasonably disapprove or unreasonably require modification of <br /> any report. The City may also make reasonable modifications to the conditions of the <br /> License based upon a submittal from the Licensee. The City shall respond to <br /> Licensee submittals on a timely basis, which shall be no later than formal MPCA time <br /> lines for review and comment for concurrent submittals. <br /> 3.) Scope and Conduct of Related Operations. <br /> (01) Recycling Center. The operation of a recycling center on the Landfill <br /> Property may be conducted, if in conformance with all applicable terms and <br /> conditions of this License, subject to the following conditions: <br /> (a) The operation of the recycling center shall comply in all respects with <br /> all applicable requirements of the City Code of Ordinances and all <br /> applicable federal, state, and county laws and regulations. <br /> (b) The recycling center shall be located and operated as shown on plans <br /> submitted by Licensee and approved by City staff. The recycling <br /> • <br /> PXB 100940 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.