Laserfiche WebLink
(e) That Permittee is in strict compliance with all other terms, conditions <br /> 4111 and requirements of this Conditional Use Permit, including specifically, <br /> but not limited to, the operational and environmental monitoring <br /> requirements of sections 4, 6, and 7; and the requirements of <br /> sections 16 and 24 to make prompt payment of all fees due to the City. <br /> No demolition debris may be accepted at the demolition debris landfill <br /> if this condition is not complied with. Permittee must immediately stop <br /> accepting demolition debris upon written notice from the City that there <br /> is a violation of this condition. <br /> (04) Other Related Operations. No other operations or activities, whether or not <br /> related to the Landfill, shall be permitted or allowed on the Landfill Property unless <br /> this Permit is first amended to specifically allow such operations and to specify the <br /> applicable conditions except mining activities or other operations licensed or permitted <br /> separately by City. <br /> 3.) Buffer Zone. A Buffer Zone shall be established within the perimeter of the <br /> Landfill Property around the waste disposal areas of not less than 200 feet. Within this <br /> Buffer Zone, no waste disposal may occur. Permittee shall place a six (6) foot high earth <br /> berm, landscaped with evergreen trees and protected from erosion, at the outside perimeter <br /> of the Buffer Zone. Where the Buffer Zone contains heavily wooded areas, exception to <br /> installing the berm and landscaping shall be allowed. A plan for establishment of the Buffer <br /> Zone shall be submitted to the City no later than March 1, 1996 for approval by City staff <br /> and shall be implemented as provided in the plan. <br /> 4.) Specific Additional Operational Requirements. <br /> (01) Leachate Transmission Pipes. The leachate transmission pipe shall be <br /> redesigned for subsequent Landfill phases to include the use of secondary containment <br /> capability. Permittee shall verify to the City every four (4) years that the existing <br /> pipe does not leak. <br /> (02) Backup Leachate Pumps. Permittee shall maintain backup pumps for use in <br /> the event of pump failure at the wet well and leachate storage tank on-site, or shall <br /> maintain provisions for restoring temporary leachate pumping within a 24 hour <br /> period. <br /> (03) Leachate Holding Tank. Permittee shall ensure that the leachate holding tank <br /> is pumped out on a regular schedule. It shall be a violation of this Permit to allow <br /> leachate to collect on the liner to a depth exceeding one foot due to the leachate <br /> holding tank being full. <br /> (04) Gas Venting System. Initiate operation of the active landfill gas venting <br /> system by March 1, 1996. <br /> 411 <br /> PXB 100862 <br /> 5. <br />