My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.3 ERMUSR 04-10-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
04-10-2018
>
2.3 ERMUSR 04-10-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 3:48:28 PM
Creation date
4/6/2018 3:38:44 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MORATORIUM EFFECTIVE FEBRUARY 14,2017 ON ALL OF THE FOLLOWING LOAD CONTROL <br /> PROGRAMS;WITH THE EXCEPTION OF THE ELECTRIC VEHICLE CHARGING PROGRAMS. <br /> 3. This equipment will be energized only for 8 off-peak hours daily. <br /> 4. A meter to measure electricity consumed by the ETS water heater. <br /> 5. A load control device and meter socket to accommodate the off-peak meter. <br /> Cycled Air Conditioning: This Program is available to all customers served by ERMU who <br /> have central air conditioners. Program participants must allow installation of a utility supplied <br /> load control device so air conditioning demand can be reduced at critical times. This Program is <br /> subject to the following terms and conditions: <br /> 1. The Customer must have a conventional central air conditioner,ASHP or GSHP,of at <br /> least 2 tons capable of being interrupted with a 5 amp relay. <br /> 2. ERMU will fumish the load control device and pay to have it installed by a licensed <br /> electrician. Separate metering is not required. <br /> 3. The Customer must allow access for installation of the load control device during normal <br /> business hours. <br /> 4. The Customer must allow access for load control maintenance and compliance <br /> inspections by ERMU personnel during normal business hours. <br /> 5. Customers must agree to allow ERMU or its designee to remotely cycle their central air <br /> conditioner,ASHP or GSHP, off for approximately 15 minutes out of each 30 minute <br /> period at critical peak use times during the cooling season(May through September). <br /> Except for extreme emergencies,duration of said control will not exceed 6 hours per day <br /> and more than 200 hours total per cooling season. <br /> 6. Customers who elect to participate in this Program must remain on it for at least one <br /> cooling season or part of the load control installation costs may be assessed to the <br /> customer. <br /> 7. Customers with central air conditioners,ASHP or GSHP,that are grossly oversized for <br /> the conditioned space will not be allowed to participate. Such systems do not provide <br /> ERMU sufficient load reduction relief at critical peak use times. <br /> 8. The rate is subject to application of the Power Cost Adjustment(PCA). <br /> 9. Cycled AC Program participants will receive a$3 per month credit for allowing ERMU to <br /> interrupt their air conditioners as outlined above. Such payments will be provided in the <br /> form of a bill credit during the five monthly billing periods of June—October. <br /> Approved Adopted December 12, 2017 <br /> Effective January 1, 2018 <br /> Revised April 10,2018 <br /> 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.