My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
12-19-1995
>
6.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 3:36:46 PM
Creation date
4/6/2018 3:36:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> • requires secondary containment. Any new tanks will be properly <br /> contained. <br /> Staff is proposing that mineral excavation activities remain a <br /> minimum of 5 ft. above the seasonally high water table. The <br /> groundwater contours in this area are approximately 955 ft. to 960 ft. <br /> above mean sea level. The approximate average of the current depth <br /> of excavation in this area is 970 ft. above mean sea level. This <br /> stipulation will further protect groundwater and is also required by <br /> MPCA for the landfill's permit. <br /> Lastly, staff is proposing that the excavation permit for this operation <br /> excludes any wash operation. Water appropriated from this site could <br /> increase the lateral movement of contaminants in the groundwater <br /> from the original cell of the landfill. <br /> 4. Reclamation <br /> The proposed reclamation plan for this mineral excavation operation is <br /> to use the property for a sanitary landfill. Details regarding final <br /> elevations, ground cover, etc., are contained in the landfill's closure <br /> . plan. The contours proposed in the landfill's plan are consistent with <br /> the city's Environmental Impact Statement on mineral excavation. <br /> 5. Other Conditions <br /> Other conditions staff is proposing to place on this operation are <br /> basically standard for all mineral excavation operations and can be <br /> found in the attached conditional use permit. <br /> 6. Mining During <br /> In their application, Straightline estimates 20 to 30 years of additional <br /> mining. Staff believes a more realistic figure to be 5 to 7 years. <br /> Recommendation <br /> Staff finds the proposed mineral excavation operation consistent with the <br /> City's Mineral Excavation Ordinance, the City's Environmental Impact <br /> Statement on Mineral Excavation, the City's Conditional Use Permit <br /> Ordinance, and other applicable ordinances. We therefore recommend <br /> approval of this request under the terms found in the attached conditional <br /> use permit. <br /> • <br /> pc 12-12/bz/stever <br />
The URL can be used to link to this page
Your browser does not support the video tag.