My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
12-19-1995
>
6.5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 3:36:46 PM
Creation date
4/6/2018 3:36:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
An Emergency Spill Response Plan has been developed for this site in • <br /> conjuntion with Elk River Landfill, Inc. Please see Appendix#3, page 17 (Site <br /> Emergency Evacuation Plan) and Appendix #4, page 18 (Means of Egress) <br /> which is in place to repond to an emergency spill situation should one occur. <br /> This plan was developed as a collective effort for inclusion in the Health and <br /> Safety Plan adopted by Elk River Landfill, Inc., Straightline Excavation, Inc., and <br /> Conteck Environmental Services, Inc. and dated April 1, 1994. <br /> The shop facility has in effect a Small Quantity Hazardous Waste <br /> Generator License registered with the MPCA, (See Appendix #5, page 19). All <br /> used engine fluids and filters are removed from the site by licensed recycling <br /> vendors. <br /> B. WIND AND WATER EROSION: <br /> Erosion by wind and water are for the most part contained on site. <br /> C. DUST CONTROL: <br /> Dust is created from the following two sources; dust from the plant <br /> processing (conveyor transfers) and from haul road traffic. The dust from the <br /> plant processing is naturally held to a minimum by moisture in the bank. Dust 411 <br /> from the haul roads on site is minimized by a watering regimen. This regimen <br /> consists of watering all site roads a minimum of three times, a day during dry <br /> months and documenting the amount of water used. <br /> An Air Emissions Permit has been obtained by Straightline Excavation, <br /> Inc. from the Minnesota Pollution Control Agency. (Please see Appendix#6, <br /> page 20 for active permit copy, including Amendments 1,2;&3). Also, please see <br /> Appendix#7, page 21 (Straightlines' most recent inspection report by MPCA) <br /> dated August 10, 1995 demonstrating compliance with the permit standards. <br /> D. MAINTENANCE OF SECURITY: <br /> The owner of the site, Elk River Landfill, Inc., is in the process of working <br /> towards the installation of a full parameter fence for this site. <br /> E. CONTROL OF WEEDS: <br /> Weeds are controlled on site by the owner. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.