My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.12 PCSR 09-26-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
09-26-1995
>
5.12 PCSR 09-26-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2018 10:19:41 AM
Creation date
4/6/2018 3:00:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. iIst <br /> CONSULTING ENGINEERS September 19, 1995 <br /> 1326 Energy Park Drive File: 230-287-11 <br /> St.Paul,MN 55108 <br /> 612-644-4389 Mr. Steve Ach <br /> 1-800-888-2923 City Planner <br /> Fax:612-644-9446 City of Elk River <br /> 13065 Orono Parkway <br /> P.O. Box 490 <br /> Elk River, MN 55330 <br /> RE: COUNTRY CROSSING BUSINESS CENTER, SECOND ADDITION <br /> Dear Mr. Ach: <br /> As you requested, we have reviewed the preliminary plat of Country Crossing Business <br /> CIVIL ENGINEERING, Center, Second Addition. Based on our review, we would offer the following comments. <br /> ENVIRONMENTAL <br /> MUNICIPAL 1. The plat was prepared by John Oliver and Associates, and includes one lot at the <br /> •PLANNING northwest corner with the remainder of the site between Business Center Drive and <br /> SOLID WASTE 183rd as an outlot. <br /> STRUCTURAL <br /> SURVEYING 2. We would recommend that the cul-de-sac be continued and the entire right-of-way <br /> TRAFFIC platted with this particular addition. That will eliminate the need for building a <br /> TRANSPORTATION temporary cul-de-sac and building the road in two different segments. The road <br /> itself we would recommend be a minimum of 36 feet wide, anticipating some larger <br /> ELECTRICAL/MECHANICAL vehicles accessing the businesses. <br /> ENGINEERING: <br /> HVAC <br /> POWER DISTRIBUTION 3. Provisions were made with the first phase of the Business Center development for <br /> SCADA utilities to be extended into this phase. There is sanitary sewer and water service <br /> SYSTEM CONTROLS stubbed from Business Center Drive to the proposed Lot 1 of this development. <br /> There is also sanitary sewer and water stubbed from Business Center Drive in the <br /> location of the road for extension down to serve the other lots. The watermain <br /> should be looped to 183rd where there were also provisions made for an 8-inch stub <br /> to be connected to the existing watermain in 183rd Avenue. <br /> 4. A determination will need to be made regarding how this proposed development fits <br /> into the overall drainage plan for the Country Crossings Business Center. As you <br /> recall, there were a series of ponds built with the First Addition. The question is <br /> OFFICES IN: do these ponds have enough capacity for the proposed Lot 1, or do the future ponds <br /> MINNEAPOLIS planned for south of Business Center Drive need to be constructed. <br /> PRIOR LAKE <br /> ST.PAUL <br /> WASECA <br /> An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.