My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.10 PCSR 09-26-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
09-26-1995
>
5.10 PCSR 09-26-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2018 10:19:34 AM
Creation date
4/6/2018 2:56:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Proposed Use <br /> When Novotnys originally constructed the building, it was presented as a <br /> building that would be used for storage and warehousing which is a <br /> permitted use in the I-1 (Light Industrial) zoning district. Under that <br /> interpretation, staff proceeded to review their proposed site plan and issue a <br /> building permit based on that particular use. However, with the addition of <br /> the second principal building which will serve as an office area and the <br /> current operation of the facility, staff believes a better interpretation of the <br /> use is a truck terminal A truck terminal is a conditional use permit in the <br /> light industrial district; therefore, this conditional use permit request has <br /> been expanded to include a truck terminal, as well as the second principal <br /> use. <br /> Proposed Office Building <br /> The proposed office building will be 520 square feet in size and will resemble <br /> a small residential garage. The structure will have a hip roof with asphalt <br /> shingles and pre-finished vinyl siding on all sides. These architectural <br /> materials meet the city's architectural requirements listed in the zoning <br /> ordinance (see attached excerpt from performance standards). <br /> • The proposed second building meets all of the industrial setback <br /> requirements; however, staff is concerned with its location if it interferes <br /> with the existing septic system. The approved site plan from November of <br /> 1993 indicated the septic system on the west side of the property; however, <br /> staff believes it was relocated to a location close to the proposed building. <br /> Therefore, additional information will need to be provided to make sure the <br /> building does not interfere with the existing septic system. <br /> Compliance with Approved Site Plan <br /> The approved site plan from November 1993, illustrated a bituminous <br /> parking surface along with landscaping that was to be installed as part of the <br /> improvements. Staff is concerned that these improvements have not been <br /> installed in accordance with the approved plan and would recommend that a <br /> condition of the conditional use permit state that the improvements be <br /> installed prior to June 1st of 1996. <br /> Since the original site plan was approved in November of 1993, the Planning <br /> Commission and City Council have approved anordinance requiring curb and <br /> gutter within front yard areas of industrial development. Furniture and <br /> Things located across the street and Custom Cutter and Grinding (under <br /> • construction) have both installed curb and gutter in accordance with city <br /> s:planning:p c:cu95-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.