Laserfiche WebLink
Page 4 <br /> • c. A $5,000 dollar letter of credit, bond, or deposit, approved <br /> by staff, shall be required prior to the issuance of the <br /> annual license to cover the forthcoming year's <br /> reclamation. <br /> d. The reclamation shall include top soil from the site being <br /> preserved and put back into place after mining. <br /> e. The vegetation established for reclamation must be <br /> maintained until it is self sufficient. <br /> f. Contours, finished grades, details of erosion control <br /> methods, and settling ponds, shall comply with the plans <br /> submitted and the City ordinance at the time of <br /> reclamation. <br /> (10) Traffic <br /> a. Except for localized jobs, traffic through Elk River <br /> associated with this operation shall be limited to U.S. <br /> • Highway 10 and 169. <br /> (11) Dust Control <br /> a. A permit from MPCA regarding air emissions shall be <br /> obtained when required and particulate emission <br /> standards shall be met by the operation. <br /> b. All equipment shall be located as to reduce dust to <br /> adjacent properties. <br /> c. Water, but no chemical agents, shall be used to control <br /> dust as necessary. <br /> d. The City reserves the right to require additional <br /> measures to be taken, if warranted by dust problems, <br /> including but not limited to reducing stock pile heights. <br /> (12) Hours of Operation <br /> All mineral excavation, processing, and sales activities shall be <br /> • conducted between the normal hours of 7:00 a.m. and 7:00 p.m., <br /> Monday through Saturday. Upon approval of the Building and <br /> Zoning Administrator, or his/her designee, sales (hauling <br /> cupSHIEL/bz/sr <br />