My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1, 5.2 PCSR 08-22-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
08-22-1995
>
5.1, 5.2 PCSR 08-22-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 2:30:54 PM
Creation date
4/6/2018 2:30:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shiely Company <br /> 2915 Waters Rd.,Suite 105 <br /> • Shiely Eagan,MN 55121 <br /> (612)683.0600 <br /> Fax(612)683-8108 <br /> vmwgpmmw <br /> July 27, 1995 <br /> Mr. Stephen Rohlf <br /> Zoning Administrator <br /> City of Elk River <br /> 13065 Orono Parkway <br /> P.O. Box 490 <br /> Elk River, Minnesota 55330 <br /> SUBJECT: Rezoning - Shiely/Nemeth Property - Section 10 <br /> Dear Mr. Rohlf: <br /> Please consider this request for rezoning of a portion of the Julius Nemeth property in Section 10, <br /> Elk River. We propose to rezone approximately 45 acres. Refer to the enclosed map for a <br /> pictorial description of the proposed rezoning. The proposed rezoning will be an extension of the <br /> • existing I2 zone to the south. The requested rezoning is for the purpose of allowing the operation <br /> of a ready-mix concrete plant in close proximity to the existing sand and gravel wash plant. This <br /> rezoning may be necessary if the "related facilities" which are allowed by Conditional Use Permit <br /> in the ME zone do not include concrete ready-mix. <br /> The rezoning of this property is appropriate, particularly during the term of operation of the <br /> existing sand and gravel plant. Concrete ready-mix is a related use to sand and gravel mining and <br /> is very dependent upon a supply of quality aggregates. <br /> In general terms the co-location of supplier and product user makes very good economic, logistic <br /> and land use planning sense. Economically the cost of the final product is kept down by <br /> minimizing handling of component materials. Logistically co-location takes advantage of in place <br /> infrastructure. For example: this proposed ready-mix plant will be able to use the existing <br /> operational yard area; existing water supply; convenient supply of raw materials; the established <br /> truck routes and traffic management components, both internal and external to this property. <br /> From a land use planning perspective, the proposal is a good fit. It is very compatible with the <br /> existing use of the property. It takes advantage of existing infrastructure and does not require <br /> extension of more services. The proposed ready-mix plant will not increase the incompatibility of <br /> this property with the residential neighbors. Operational hours are similar to the gravel mining. <br /> The noise from this plant and trucks will not be discernable over the gravel wash plant and the <br /> adjacent highway. The plant itself will have the necessary dust control. Road dust will be <br /> • controlled by watering. The ready-mix plant will be located behind a 20 foot high berm and trees <br /> Quality Construction Materials <br />
The URL can be used to link to this page
Your browser does not support the video tag.