Laserfiche WebLink
Mr. Steve Ach <br /> June 22, 1995 <br /> Page Two <br /> 4. A new sidewalk is shown along King Street and is indicated to be by the City. It <br /> would seem to be reasonable that the owner of the Funeral Home be responsible for <br /> constructing a sidewalk from the northeast corner of his parking area to the front <br /> of his building. This would be the means for handicap access from the parking lot <br /> to the main floor of the building, since no inside elevator is proposed. Essentially, <br /> a person parking in the rear wanting to access the main floor would have to get <br /> around the building, and this sidewalk would provide the means for that movement. <br /> 5. It appears that there is a wide enough area at the south end of the site for the <br /> proposed City river walkway corridor. However, this should be verified before any <br /> construction activities take place. <br /> Prior to final approval of this Site Plan, the Grading and Drainage Plan needs to be <br /> submitted and reviewed. However, I do not believe that is such a significant issue that it <br /> should hold up the processing of this proposal. If you have any questions regarding these <br /> comments, please call. <br /> Sincerely, <br /> MSA, CONSULTING ENGINEERS <br /> jOel.e.te,(7 <br /> Terry J. Maurer, P.E. <br /> TJM:tw <br /> 276-2203.jun <br /> • <br />