My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.8 PCSR 06-27-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
06-27-1995
>
5.8 PCSR 06-27-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2018 10:09:06 AM
Creation date
4/6/2018 2:02:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dare Conditional Use Permit Request Page 2 <br /> June 27, 1995 <br /> 411 Besides the improvements associated with the building, there is also <br /> proposed improvements to the existing parking facilities in addition to the <br /> landscaping improvements throughout the site. <br /> Zoning of the Property <br /> Currently, the property has a "split zoning". The front half of the property <br /> toward Main Street where the existing funeral home is located is currently <br /> zoned C-1 (Central Commercial). The rear half of the property is zoned C2 <br /> (Office District). Both of these zoning districts allow funeral homes as a <br /> conditional use. Ideally, properties under single ownership and used for one <br /> business should have one zoning associated with the property. However, the <br /> split zoning in this instance is no cause for alarm since a funeral home is <br /> allowed in both the Cl and C2 districts and therefore, there is no discrepancy <br /> on the allowable use of the property. <br /> Mississippi Riverfront Pathway <br /> The Riverfront Corridor Committee has been given the charge to examine <br /> opportunities for a riverfront pathway between the existing businesses along <br /> Main Street and the Mississippi River. At this time, there is not a specific <br /> design for this pathway; however, through previous meetings it is envisioned <br /> . that the first phase of the pathway has the opportunity to extend as far west <br /> as the southwest corner of the Dare property. Therefore, as a result of this <br /> conditional use permit request, the landscape architects from Hoisington <br /> Koegler Group, Inc. that have been selected to assist the Riverfront Corridor <br /> Committee in designing a pathway have been asked to pay immediate <br /> attention to this segment of the pathway so any improvements made on the <br /> Dare property would not infringe upon possible pathway improvements. <br /> The concept of a riverfront pathway has been discussed with Mr. Dare and <br /> how that pathway may be incorporated into his property. At this point, there <br /> appears not to be any reluctance on the Dares part in establishing a pathway <br /> which would include their property. However, with the addition to the <br /> funeral home in this conditional use permit request, it is the appropriate <br /> time to begin planning and possibly implementing segments to the ultimate <br /> pathway system. Two of the important legs to be considered at this point are <br /> as follows: <br /> • A segment of the pathway that would parallel the river at the rear portion of Mr. <br /> Dare's property. <br /> • A pedestrian connection from the river along King Avenue up to Main Street, to <br /> • provide additional access down to the ultimate pathway. This connection along King <br /> s:planning:pc:cu95-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.