My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4 PCSR 06-27-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
06-27-1995
>
5.4 PCSR 06-27-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2018 10:09:20 AM
Creation date
4/6/2018 1:52:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Mr. Steve Ach <br /> June 22, 1995 <br /> Page Two <br /> 3. The submittal package did not contain any grading or drainage information. Prior <br /> to final approval, a plan showing the proposed elevations of the site should be <br /> submitted. Also, a drainage plan showing the runoff from the site being picked up <br /> internally will need to be provided. As we indicated to Mr. Beaudry, we will be <br /> reviewing the capacity of the existing storm sewer on Proctor Avenue. If by chance <br /> there is a limited capacity for runoff from this project, there may need to be a minor <br /> amount of on-site ponding. <br /> 4. As you are aware, Proctor Avenue is a County road. Therefore, this plan should <br /> also be submitted to the Sherburne County Engineer for their review. <br /> 5. We also discussed with Mr. Beaudry the existing large mature trees located along <br /> the east and north boundaries of the site. He indicated he would be sensitive to the <br /> trees along the east side and intends to save the majority of the trees along the north <br /> side. His Grading and Drainage Plan showing existing elevations and proposed <br /> elevations should also include the exact location and diameter of these major trees <br /> relative to his proposed construction. <br /> • It appears that Mr. Beaudry has a workable plan for developing this piece of property. <br /> However, there should be additional information provided as indicated relative to elevations <br /> and, as we discussed with Mr. Beaudry, additional thought should be given to driveway <br /> locations, traffic patterns, and user locations. Mr. Beaudry did indicate that he is willing <br /> to reanalyze these. As long as he is willing to work with staff on these issues, I believe <br /> that these can be resolved as the project works its way through the City process. If you <br /> have any questions regarding any of these comments, please call. <br /> Sincerely, <br /> MSA, CONSULTING ENGINEERS <br /> Terry J. Maurer, P.E. <br /> TJM:tw <br /> 275-2201.jun <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.