My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 PCSR 06-27-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
06-27-1995
>
5.3 PCSR 06-27-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2018 1:50:37 PM
Creation date
4/6/2018 1:50:36 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 7. THAT THE NATURAL VEGETATION BETWEEN THE ASPHALT PLANT AND <br /> HIGHWAY 169 BE LEFT TO ACT AS SCREENING. <br /> 8. THAT DURING DRY PERIODS THE SITE MUST BE WATERED TO AVOID DUST. <br /> 9. THAT COMMERCIAL ASPHALT CO. REIMBURSE THE CITY FOR THE COST OF <br /> REVIEWING THEIR PROPOSAL. THAT THE CITY HAS THE RIGHT TO CLOSE THIS <br /> OPERATION DOWN IF THERE IS IMMINENT DANGER AND THAT CITY STAFF <br /> HAS THE RIGHT TO INSPECT THE PREMISES AT ANY REASONABLE HOUR <br /> FOLLOWING NOTIFICATION. <br /> 10. THAT THE NORMAL HOURS OF OPERATION FOR THE PLANT ARE FROM 7:00 <br /> AM TO 7:00 PM, SEVEN DAYS A WEEK. HOWEVER, HOURS CAN BE <br /> EXTENDED FOR SPECIAL CASES BY THE BUILDING AND ZONING <br /> ADMINISTRATOR AS LONG AS THE ADDITIONAL HOURS DO NOT CREATE A <br /> NUISANCE FOR SURROUNDING RESIDENCES. FURTHER MPCA NOISE LEVELS <br /> MUST BE ADHERED TO AT ALL TIMES DURING THE OPERATION OF THIS <br /> PLANT. <br /> 11. THAT THE BAGHOUSE IS TESTED ONCE PER MONTH FOR LEAKS DURING THE <br /> OPERATING SEASON AND THE RESULTS OF THOSE TESTS ARE COPIED TO THE <br /> CITY. <br /> 12. THAT THIS CONDITIONAL USE PERMIT BE REVIEWED IN TWO YEARS AND A <br /> • NEW PERMIT BE OBTAINED AT THAT TIME. <br /> 13. THAT STOCKPILES OF RECYCLABLE MATERIALS NOT BE PLACED IN SURFACE <br /> WATER AND FURTHER THAT RUN-OFF FROM THESE STOCKPILES IS DIRECTED <br /> AWAY FROM ANY SURFACE WATER. THAT THE SIZE OF THE STOCKPILES BE <br /> LIMITED TO THE AMOUNT OF MATERIAL THAT COULD POSSIBLY BE USED IN <br /> ONE YEAR, BUT NOT NECESSARILY TO WHAT WILL BE USED IN ANY ONE <br /> GIVEN YEAR. FURTHER, THAT THE CITY UNDERSTANDS WITH THIS <br /> STIPULATION THAT SOME RECYCLABLE MATERIALS WILL BE RETAINED OVER <br /> THE WINTER SO THAT RECYCLING CAN START AT THE SAME TIME AS SPRING <br /> START UP FOR THE ASPHALT PLANT. <br /> 14. THAT COMMERCIAL ASPHALT CO. CONTINUE TO WORK WITH CITY STAFF TO <br /> RESOLVE PROBLEMS WITH NOISE IF THEY ARISE. <br /> 15. THAT COMMERCIAL ASPHALT CO. CONTINUE TO WORK WITH CITY STAFF TO <br /> ELIMINATE SEDIMENT FROM BEING INTRODUCED TO THE POND ON THE <br /> EAST SIDE OF HIGHWAY 169. <br /> 16. THAT COMMERCIAL ASPHALT CO. REDUCE ODOR FROM THEIR PLANT TO <br /> ACCEPTABLE LEVELS. <br /> DATED this day of , 1995. <br /> • <br /> cup-asph/bz/stever <br />
The URL can be used to link to this page
Your browser does not support the video tag.