Laserfiche WebLink
• Mr. Steve Ach <br /> May 17, 1995 <br /> Page Two <br /> 5. As the driveway opening is cut into the site, pedestrian ramps will need to be <br /> provided on both the north and south side for continuation of the sidewalk through <br /> the driveway opening. <br /> 6. There is a spot elevation just to the north of the driveway opening which appears <br /> to be erroneous. It is listed as 936.51. It appears this should be 934.51. <br /> 7. The sign location shown on the site and grading plan does not match with the <br /> landscape plan. However, we understand that the future parking area is proposed <br /> to be built immediately which would tend to follow the layout shown on the <br /> landscaping plan. <br /> If you have any questions regarding any of these comments, please call. <br /> Sincerely, <br /> MSA, CONSULTING ENGINEERS <br /> ID G�G � <br /> Terry . Maurer, P.E. <br /> TJM:tw <br /> 272-1716.may <br /> • <br />