My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2, 5.3, 5.4 PCSR 04-25-1995
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1995
>
04-25-1995
>
5.2, 5.3, 5.4 PCSR 04-25-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2018 9:52:23 AM
Creation date
4/6/2018 1:09:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steve Ach <br /> • April 19, 1995 <br /> Page Three <br /> With our general knowledge of the storm sewer systems available in this area, we <br /> believe that an adequate design can be presented for this piece of property to deal <br /> with storm drainage issues for the type of development shown on the sketch plan. <br /> During our review we have not attempted to analyze parking needs, which are shown on <br /> the sketch plan. No topography is shown; therefore, no review of the proposed grading of <br /> the site has been conducted. Nor are items such as signing or landscaping shown; <br /> therefore, no review of these items has been prepared. <br /> In summary, we believe that the general traffic and utility service for this site can be dealt <br /> with adequately to support the type of commercial development shown on the sketch plan. <br /> If you have any questions regarding any of these comments, please do not hesitate to call. <br /> Sincerely, <br /> MSA, CONSULTING ENGINEERS <br /> Terry J. Maurer, P.E. <br /> TJM:pd <br /> 267-1910.apr <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.