Laserfiche WebLink
i. Elevations of all sides of the building <br /> ii. Type and color of exterior building materials <br /> iii. A typical floor plan and dimensions of all structures <br /> iv. Location of trash containers, heating, air conditioning and <br /> ventilation systems <br /> v. Proposed screening of trash containers, heating, air conditioning and <br /> ventilation systems. <br /> b. B. Exterior Building Finish <br /> i. Standards for the R-3, R-4, C-1 , C-2 and PUD zones. One hundred percent <br /> (100%) of the exterior building finish shall consist of materials comparable in <br /> grade and quality to the materials on the list of exterior building finishes <br /> referenced in this section. <br /> ii. Standards for the C-3 zoning. A minimum of seventy-five (75%) of the <br /> • exterior building finish shall consist of materials comparable in grade and <br /> quality to the materials on the list of exterior building finishes referenced in <br /> this section. <br /> iii. Standards for the I-I and 1-2 zones. A minimum of twenty-five percent <br /> (25%) of the exterior building finish shall consist of materials comparable in <br /> grade and quality to the materials on the list of exterior building finishes <br /> referenced in this section. <br /> iv. Approved Exterior Building Finishes <br /> (a) Face Brick <br /> (b) Natural Stone <br /> (c) Glass <br /> (d) Wood <br /> (e) Stucco <br /> (f ) Aluminum Lapsiding <br /> (g) Masonite <br /> (h) Vinyl <br /> (i) Specially designed precast concrete units or concrete blocks (only if <br /> the surfaces have been integrally treated with an applied decorative <br /> material or textured). <br /> • (j) Other approved architectural metal siding <br /> Page 10 <br />