My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.5 PCSR 08-23-1994
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1994
>
08-23-1994
>
5.5 PCSR 08-23-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2018 9:06:44 AM
Creation date
4/6/2018 9:58:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resource Recovery Facility Page 2 <br /> August 23, 1994 <br /> • <br /> The proposed building will measure fifty (50) feet by eighty (80) feet (4,000 square <br /> feet) and be constructed of metal skin siding and painted to match the existing <br /> facility. The applicant proposes one large twenty (20) foot wide by fourteen (14) foot <br /> high overhead door on the west elevation. The building will also have a concrete <br /> floor. <br /> The I1 (Light Industrial) zoning district requires that twenty-five (25) percent of the <br /> exterior building elevation must be of an approved finish. Metal skin siding is not <br /> an approved finish. The proposed accessory building is 100 percent metal skin <br /> siding, therefore, in order to be in compliance with City code, twenty-five (25) of the <br /> exterior must be upgraded with an approved finish such as brick, stucco, etc. Staff <br /> would suggest that a four (4) foot decorative brick wall be used around the entire <br /> perimeter of the structure to protect the lower area from damage and give the <br /> building an aesthetically pleasing appearance. <br /> STORAGE <br /> The building will be used to store equipment and parts which are currently kept <br /> outside. The attached floor plan layout shows areas where a lawn tractor and <br /> accessories (such as tires, buckets for front end loaders, etc.) will be stored. Other <br /> areas of the accessory building will be used to store various parts needed for the <br /> • <br /> operation of the facility. The applicant has indicated that no hazardous waste of <br /> any kind will be kept within the building. <br /> RECOMMENDATION <br /> Staff recommends approval of the conditional use permit request by the Elk River <br /> Resource Recovery Facility to construct a fifty (50) by eighty (80) foot metal skin <br /> accessory structure with the following conditions: <br /> 1. THE EXTERIOR OF THE ACCESSORY BUILDING BE <br /> PAINTED TO MATCH THE EXISTING FACILITY. <br /> 2. A MINIMUM OF TWENTY-FIVE (25) PERCENT OF THE <br /> EXTERIOR BUILDING MUST CONSIST OF AN APPROVED <br /> FINISH AS REQUIRED BY CITY CODE. <br /> • <br /> resource.pc <br />
The URL can be used to link to this page
Your browser does not support the video tag.