Laserfiche WebLink
City Comm Minutes <br />March 19, 2018 <br />Page 3 <br />3. If the proposed work described in the application and CUP has not been <br />substantially completed within two years after the date of issuance, the <br />permit shall expire and become void. <br />4. The applicant must apply for and receive approval for all required permits <br />before any construction may begin. <br />5. The city building official and fire marshal shall inspect the building for <br />compliance with all state and local building codes. <br />6. All refuse collection containers shall be stored within an enclosure facility <br />large enough to accommodate the collection of all materials. Refuse <br />containers and materials must be out of sight from neighboring properties <br />and street. <br />7. The applicant shall submit a site plan for staff approval identifying the <br />required 89 required parking stalls. <br />8. Parking stalls shall be striped in accordance with City Ordinance, Section <br />30-892 and as shown on an approved site plan. <br />9. As additional buildings are planned, all work must be submitted for prior <br />city approval before permit application. <br />10. All maintenance or shop work shall take place indoors. <br />11. Outdoor storage areas shall be completely screened from view within all <br />public rights-of-way and commercial or residentially -zoned parcels. <br />Screening will consist of at least a 6 -foot tall fence made of wood, factory <br />finished metal or vinyl panels, or chain link with vinyl slats, if not screen <br />by an adjacent building. <br />12. Outdoor storage areas shall not be located in designated parking areas or <br />areas striped for parking. <br />13. Expansion shall comply with the request outlined in the following table: <br />otal of Cargill <br />Existing <br />Expansion <br />Request <br />Total w/add <br />aces <br />ce Space (s <br />25,000 <br />0 <br />25,000 <br />ehouses <br />ELaib <br />60,000 <br />10,000 <br />70,000 <br />ess space s� <br />15,000 <br />5,000 <br />20,000 <br />Space (s <br />11,000 <br />14,000 <br />25,000 <br />Shop Space (s <br />7,500 <br />0 <br />7,500 <br />Animal Housing so <br />80,000 <br />40,000 <br />120,000 <br />Animal Units <br />600 <br />300 <br />900 <br />Process Tons/Year <br />3,000 <br />0 <br />3,000 <br />Lagoons (capacity <br />Rallons) <br />3,600,000 <br />0 <br />3,600,000 <br />Acreage total <br />920 <br />0 <br />920 <br />Employees (FT & <br />Tem <br />125 <br />25 <br />150 <br />FuelStoxa a allons <br />35,000 <br />0 <br />35,000 <br />14. Any expansion that is consistent with the expansion request summary in <br />the table above shall require administrative site plan review. <br />15. Any expansion that is not consistent with the expansion request summary <br />above shall require a CUP amendment. <br />NATURE <br />