Laserfiche WebLink
Mr. Steve Ach <br /> August 18, 1994 <br /> Page Three <br /> throughout the parking area. The same is true with sanitary sewer being extended <br /> into the site from the line along the west property line. We believe that this is an <br /> adequate utility service plan. <br /> E. MISCELLANEOUS <br /> • Glenn Sundeen from the Elk River Municipal Utilities has indicated a need <br /> for utility easements around the perimeter of the site and on the lot line <br /> between the auto and retail sites. <br /> • A traffic analysis, as discussed previously, would also identify whether or not <br /> there is a need for a 4-way stop at 189th and Dodge Avenue, which is the <br /> northerly entrance and exit from the proposed site. <br /> • A sidewalk should be provided along Dodge Avenue adjacent to the project <br /> site. <br /> If you have any questions or comments regarding any of these issues, please call. <br /> • Sincerely, <br /> MSA, CONSULTING ENGINEERS <br /> 4;274 e(A ex <br /> Terry f. Maurer, P.E. <br /> TJM:tw <br /> • <br /> 230/245-1807.aug <br />