Laserfiche WebLink
JUN 1 4 894 <br /> Sherburne County <br /> ip <br /> - i hwa (Department <br /> ...l...u.. <br /> ..a_.. .. <br /> P.O. BOX 338 • ELK RIVER, MN 55330 • PHONE(612)441-1722 • FAX(612)441-2264 <br /> 6/9/94 <br /> Steven Ach, City Planner <br /> P.O. Box 490 <br /> 13065 Orono Parkway <br /> Elk River, MN 55330 <br /> Dear Mr. Ach: <br /> I have a concern regarding the above mentioned preliminary plat. The alignment of Lander Street <br /> NW creates an intersection access that would conflict with the south access of Macon St. NW <br /> only 300' west. The current arrangement would cause confusion and possible accidents for <br /> • motorists. We would not grant an access to CSAH 30 at this time. <br /> An acceptable access directly across from the existing south access of Macon St. NW is <br /> recommended. We would also require that a right turn lane be constructed to our standards when <br /> the access is constructed. Also, the stop sign must be installed before the access is usable. <br /> The letter is only commenting on the preliminary plat and does not preclude any other <br /> requirements. An access permit must be obtained from the County Engineer prior to any <br /> construction of a an access to a county highway. <br /> Si erely, <br /> dip4..7-70/ <br /> Dave Schwarting, P.E. <br /> County Engineer <br /> 411 <br />