My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2 PCSR 06-28-1994
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1994
>
06-28-1994
>
5.2 PCSR 06-28-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2018 3:24:17 PM
Creation date
4/2/2018 3:24:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BENSHOOF & ASSOCIATES, INC. <br /> TRANSPORTATION ENGINEERS AND PLANNERS 3111 7 199 <br /> • 7301 OHMS LANE, SUITE 500/EDINA, MN 55439/(612) 832-9858/FAX(612)832-9564 ay'?+ <br /> June 17, 1994 REFER TO FILE: 94-21 <br /> MEMORANDUM <br /> TO: Kim Vickroy, Solid Rock Church <br /> A <br /> FROM: James A. Benshoo and Edward F. TerhaarE <br /> RE: Results of Traffic Analysis for Proposed School at Solid Rock Church <br /> PURPOSE <br /> The purpose of this memorandum is to present the traffic analysis for the proposed <br /> school at the existing Solid Rock Church. <br /> The traffic analysis and results presented in this memorandum are organized as follows: <br /> • 1) Background Information. This includes information obtained from church <br /> staff on enrollment projections and anticipated traffic characteristics of the <br /> school. Daily traffic counts were also collected on adjacent roadways that will <br /> be utilized for trips to and from the school. <br /> 2) Traffic Forecasts. Traffic forecasts were developed for the year after the <br /> opening of the school as well as for the "full development" scenario. <br /> 3) Traffic Analysis. The ability of the adjacent roadways to accommodate the <br /> additional traffic generated by the school was analyzed. <br /> 4) Conclusions <br /> BACKGROUND INFORMATION <br /> Proposed School Information <br /> The proposed K-12 school will be located within the existing church building and is <br /> expected to have approximately 100 students and 10 additional staff people during the <br /> first school year. The number of students could increase to a maximum of 300 and the <br /> number of staff people to 15 within five years of opening, depending on the interest <br /> level. The majority of the students are expected to come from the City of Elk River, <br /> with smaller numbers coming from surrounding areas. Busing will be provided by the <br /> Elk River School District to bring students to and from the school. The school day is <br /> • expected to begin at 8:00 a.m. and end between 2:30 and 3:00 p.m., with no <br /> extracurricular activities occurring at the school. <br />
The URL can be used to link to this page
Your browser does not support the video tag.