My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1 PCSR 06-21-1994
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1994
>
06-21-1994
>
3.1 PCSR 06-21-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2018 3:11:57 PM
Creation date
4/2/2018 3:11:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN 17 1994 <br /> 11 St <br /> • i <br /> CONSULTING ENGINEERS June 16, 1994 <br /> File: 230-221-11 <br /> Mr. Steve Ach <br /> City Planner <br /> City of Elk River <br /> 13065 Orono Parkway <br /> Elk River, MN 55330 <br /> CIVIL ENGINEERING RE: DARKENWALD PROPERTY <br /> PROPOSED AUTOMALL <br /> ENVIRONMENTAL <br /> Dear Mr. Ach: <br /> MUNICIPAL <br /> This correspondence is in followup to the last Planning Commission meeting regarding this <br /> PLANNING item and our subsequent meeting with the developers of the proposed Automall. The one <br /> outstanding engineering item was the reconstruction of Carson Street as it intersects Main <br /> STRUCTURAL Street at the south end of the project site. We have agreed with the developers that this <br /> • intersection should consist of three lanes: an inbound lane 14 feet wide, a 2-foot striped <br /> SURVEYING island separating inbound from outbound, and two outbound 12-foot lanes. This results in <br /> a full width of 40 feet at the intersection of Main Street. We have also agreed that the right <br /> TRAFFIC turn lane for southbound Carson Street should be extended approximately to the north <br /> driveway of the Burger Time Restaurant. <br /> TRANSPORTATION <br /> When we met with Mr. John Weicht and his group of developers, we discussed the affect <br /> of this work on the Burger Time parking lot relative to their head-in parking adjacent to <br /> Carson Street and the grade difference between Carson Street and their property. Prior to <br /> any construction taking place, we should receive and review a detailed drawing indicating <br /> how Mr. Weicht proposes to accomplish this construction so as not to impact the Burger <br /> Time parking area nor create an unsafe condition on Carson Street. <br /> If you have any questions or comments regarding this issue, please call. <br /> 1326 Energy Park Drive Sincerely, <br /> St.Paul,MN 55108 MSA, CONSULTING ENGINEERS <br /> 612-644-4389 <br /> Fax:612-644-9446 � A <br /> • 9800 Shelard Parkway Terry J. Maurer, P.E. <br /> Minneapolis,MN 55441 TJM:tw <br /> 612-546-0432 221-1615.jun <br /> Fax.612-544-6398 <br />
The URL can be used to link to this page
Your browser does not support the video tag.