My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6 PCSR 05-24-1994
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1994
>
05-24-1994
>
5.6 PCSR 05-24-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 8:40:10 AM
Creation date
4/2/2018 3:02:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED SCOUT STORAGE BUILDING <br /> ON LOT 4 OF BLOCK 1 OF RIDGEWOOD EAST <br /> 2ND ADDITION <br /> OWNED BY THE CITY OF ELK RIVER <br /> SUMMARY <br /> The three scout troops in Elk River need storage space to store <br /> their camping equipment. The American Legion has appropriated up to <br /> $15 , 000 . 00 to build a storage building for Troops 90 , 99 and ill. The <br /> construction of the building will be done mainly by professional <br /> carpenter/volunteers . Material will be acquired at reduced cost and <br /> the building will be placed on city owned property and maintained by <br /> the Elk River scout troops. <br /> BUILDING <br /> The building will initially be sized at 30 ft. by 60 ft. and <br /> subdivided into three parts, one for each troop. Layout allows for <br /> future expansion for use by other community orientated youth <br /> organizations, as depicted on Plot Plan. Adequate room is set aside for <br /> the existing storm water runoff holding pend on said Lot 4 . <br /> COST <br /> Building Cost $10 , 552 . 08 <br /> Less Discount from River Valley Lumber $-2 , 132 . 29 <br /> • Actual Building Cost $ 8 , 419 . 79 <br /> Surveying Donated $ 0 . 00 <br /> Excavating Donated by Phil Huls of P.B.R. -$ 0 . 00 <br /> Footing & Floating Slab by Bob Kopinski $ 0 . 00 <br /> Carpenters-Donated ( 2 from Tr. 90 , 1 Am. Legion) $ 0 . 00 <br /> Concrete--$2000 less $1400 Donation by AME $ 400 . 00 <br /> 1 row concrete block $ 72 . 45 <br /> Utilities to building Donated $ 0 . 00 <br /> Electrical Wiring (open quote) --$ <br /> Driveway ( if required by city) (open quote) --$ <br /> Miscellaneous Labor $ 200 . 00 <br /> Total Cost $ 9092 . 24 <br /> PERMITS <br /> Conditional Use Permit <br /> Building Permit <br /> Zoning requirements <br /> LIABILITY <br /> The city would own the building and have liability insurance on <br /> their property. In addition, the scouts also have their own liability <br /> insurance which will cover them while at the building site. <br /> •MAINTENANCE <br /> The scouts would maintain the building and grounds . <br /> CONTACTS: Roger Kostreba, Scoutmaster Troop 111 ( 441-4457 ) <br /> Todd Anderson, Scoutmaster Troop 99 ( 441-6437 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.