Laserfiche WebLink
Anderson, CUP Page 3 <br /> April 26, 1994 <br /> • <br /> 1. NONE OF THE EXCAVATED MATERIAL IS PLACED BACK <br /> INTO THE WETLAND BOUNDARY. <br /> 2. FOR SAFETY PURPOSES DURING THE ENTIRE PERIOD OF <br /> THE PROJECT, ALL SLOPED AREAS SHALL HAVE A <br /> MAXIMUM RATIO OF 4 FEET HORIZONTAL TO 1 FOOT <br /> VERTICAL. <br /> 3. SLOPED AREAS SHALL BE PLANTED WITH GROUND COVER <br /> SUFFICIENT TO CONTAIN THE SOIL. SUCH GROUND <br /> COVER SHALL BE TENDED AS NECESSARY UNTIL IT IS <br /> SELF SUSTAINING. SILT FENCING IS REQUIRED UNTIL <br /> THE GROUND COVER IS SELF SUSTAINING. <br /> 4. FOR SAFETY PURPOSES, THE POND SHALL BE NO DEEPER <br /> THAN 4 TO 5 FEET IN DEPTH. <br /> 5. ANY EXCAVATION OR FILLING SHALL NOT DISRUPT THE <br /> OVERALL DRAINAGE PATTERNS FOR THIS AREA. <br /> • 6. CONTRACTOR AND PROPERTY OWNER WORK WITH THE <br /> DNR TO CONSTRUCT A POND THAT IS BENEFICIAL TO <br /> WILDLIFE. <br /> 7. APPROVAL OF THIS RECOMMENDATION BE CONTINGENT <br /> UPON APPROVAL BY THE ARMY CORPS OF ENGINEERS. <br /> 8. THE PROJECT BE COMPLETED IN ONE CONSTRUCTION <br /> SEASON. <br /> 9. THE HOURS OF OPERATION BE AS PER CITY CODE. <br /> • <br /> anderson.planning <br />