My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7 PCSR 03-22-1994
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1994
>
03-22-1994
>
7 PCSR 03-22-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 8:31:45 AM
Creation date
4/2/2018 2:07:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III8 . That during dry periods the site must be watered to avoid <br /> dust. <br /> 9 . That Bartons reimburse the City for the cost of reviewing <br /> their proposal . That the City has the right to close this <br /> operation down if there is imminent danger and that City <br /> staff has the right to inspect the premises at any <br /> reasonable hour following notification. <br /> 10 . That the normal hours of operation for the plant are from <br /> 7 : 00 a.m. to 7 : 00 p.m. , seven days a week. However, hours <br /> can be extended for special cases by the Building and <br /> Zoning Administrator as long as the additional hours do <br /> not create a nuisance for surrounding residences . Further <br /> MPCA noise levels must be adhered to at all times during <br /> the operation of this plant. <br /> 11 . That the baghouse filter is tested once per month for <br /> leaks and the results of those tests are copied to the <br /> City. <br /> 12 . That this conditional use permit be reviewed in two years <br /> and a new permit be obtained at that time. <br /> • 13 . That stockpiles of recyclable materials not be placed in <br /> surface water and further that run-off from these <br /> stockpiles is directed away from any surface water. That <br /> the size of the stockpiles be limited to the amount of <br /> material that could possibly be used in one year, but not <br /> necessarily to what will be used in any one given year. <br /> Further, that the City understands with this stipulation <br /> that some recyclable materials will be retained over the <br /> winter so that recycling can start at the same time as <br /> spring start up for the asphalt plant. <br /> 14 . That Commerical Asphalt continue to work with City staff <br /> to resolve problems with odor and noise if they arise. <br /> There were additional stipulations placed on this operation <br /> during 1990 renewal that do not appear in the Planning <br /> Commission' s recommended conditions for this renewal . Those <br /> stipulations were rendered obsolete by the issues they dealt <br /> being resolved. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.