My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8 PCSR 02-22-1994
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
_Prior to 1999
>
1994
>
02-22-1994
>
8 PCSR 02-22-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 8:30:34 AM
Creation date
4/2/2018 1:25:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steve Ach <br /> February 22, 1994 <br /> Page Four <br /> C. UTILITY PLAN <br /> ■ Sanitary sewer and water are shown to come from the northeast corner of the <br /> plat from Orono Parkway down Hudson Street, then throughout the plat. The <br /> utilities will need to be extended westerly along Orono Parkway to at least <br /> Joplin. Consideration will also need to be given to the larger service area to <br /> determine whether or not these utilities should also continue southerly along <br /> Joplin Street. <br /> • Watermain will need to be looped southerly from this plat to Heritage <br /> Landing to the south. This can be accomplished along the Gary Street <br /> alignment. <br /> • The number and locations of fire hydrants appears to be adequate. This <br /> should be reviewed with the fire chief through the design phase of the project. <br /> If you have any questions regarding these comments, please call. <br /> Sincerely, <br /> MSA, CONSULTING ENGINEERS <br /> Terry . Maurer, P.E. <br /> TJM:tp <br /> 194-2201.feb <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.